Product Breakdown Structure (PBS) in MS Project

Product Breakdown Structure Your project needs to be broken down into major components leading up to the objective: the main deliverable. An outline of all the project’s deliverables is called a Product Breakdown Structure (PBS). This PBS results in a Work Breakdown Structure (WBS), which shows the work required to produce the deliverables (PBS) and reach these milestones. The WBS are thus the tasks. [divider] [action_call text=”Microsoft Project Introduction …